The UK Home Automation Archive

Archive Home
Group Home
Search Archive


Advanced Search

The UKHA-ARCHIVE IS CEASING OPERATIONS 31 DEC 2024

Latest message you have seen: RE: OT - Grand Designs 21:00; Ch4


[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

RE: Visonic Powermax


  • To: "'ukha_d@xxxxxxx'" <ukha_d@xxxxxxx>
  • Subject: RE: Visonic Powermax
  • From: "Stainton-James, Mark (London)" <stainmar@xxxxxxx>
  • Date: Thu, 14 Feb 2002 13:30:57 -0000
  • Delivered-to: mailing list ukha_d@xxxxxxx
  • Mailing-list: list ukha_d@xxxxxxx; contact ukha_d-owner@xxxxxxx
  • Reply-to: ukha_d@xxxxxxx

1. Does the entry exit zone need to be hardwired, am assuming this
would be front door?Any other wires required apart from bell box and
power?

 

No.  The Bell Box, Power, Phone Lead and X10 lead are the only wires needed



2. Is it possible to have the X10 devices come on at timed intervals
to simulate occupation without an alarm event (arm,disarm etc) being
triggered.

 

Yes, but it isn't very complex (no more functionality than you'd get with a traditional timer switches).

 

 



Yahoo! Groups Sponsor
ADVERTISEMENT

For more information: http://www.automatedhome.co.uk
Post message: ukha_d@xxxxxxx
Subscribe:  ukha_d-subscribe@xxxxxxx
Unsubscribe:  ukha_d-unsubscribe@xxxxxxx
List owner:  ukha_d-owner@xxxxxxx

Your use of Yahoo! Groups is subject to the Yahoo! Terms of Service.

Home | Main Index | Thread Index

Comments to the Webmaster are always welcomed, please use this contact form . Note that as this site is a mailing list archive, the Webmaster has no control over the contents of the messages. Comments about message content should be directed to the relevant mailing list.