The UK Home Automation Archive

Archive Home
Group Home
Search Archive


Advanced Search

The UKHA-ARCHIVE IS CEASING OPERATIONS 31 DEC 2024


[Message Prev][Message Next][Thread Prev][Thread Next][Message Index][Thread Index]

Re: Extensive re-wiring, update




Mark Kaye wrote:

> Phew...  Had Ben Addison round to take a look at the house.  I am
having
> 4x CAT6 terminated next to 90% of the power points in the house.  95%
of
> the lighting rewired for C-BUS.  All cabling run in for alarm contacts
> on windows and doors, PIRs and smoke alarms.  Wiring for Comfort
keypads
> (main entrance hall, east landing, west landing and kitchen).
> In-ceiling speakers in kitchen, dining room, main bathroom, second
> bedroom, master bedroom and en-suite.  6 gang C-BUS Saturn switches
> everywhere except the lounge which will be a Saturn DLT.  Ben has
quoted
> for 4 8 channel dimmers and 1 8 channel relay module.


Just out of interest, how much will all that work cost?

Jim



UKHA_D Main Index | UKHA_D Thread Index | UKHA_D Home | Archives Home

Comments to the Webmaster are always welcomed, please use this contact form . Note that as this site is a mailing list archive, the Webmaster has no control over the contents of the messages. Comments about message content should be directed to the relevant mailing list.