The UK Home Automation Archive

Archive Home
Group Home
Search Archive


Advanced Search

The UKHA-ARCHIVE IS CEASING OPERATIONS 31 DEC 2024


[Message Prev][Message Next][Thread Prev][Thread Next][Message Index][Thread Index]

Part P questions



Some questions for anyone with part P experience.

I've decided to go the Idratek route, as being the easiest wired system to
retro-fit and still leave the existing wiring intact (in case I sell the
house in the future).

First off, is LAN cabling outside the "remit" of part P?

Am I correct in thinking that replacement of switches with Idratek
equivalents is replacement and, therefore, doesn't need to be notified?

How is the Idratek bus cabling viewed under the rules?

(Assume the above are not in a kitchen or special location).


As an aside, I've just looked at the latest version of the notification
guide (v8 !!). Interesting to note that you can now pretty well do anything
in an out-building, providing the incoming supply was already there.
Originally it came under the same restrictive rules as the house.


Thanks for any info!




Jim


[Non-text portions of this message have been removed]




UKHA_D Main Index | UKHA_D Thread Index | UKHA_D Home | Archives Home

Comments to the Webmaster are always welcomed, please use this contact form . Note that as this site is a mailing list archive, the Webmaster has no control over the contents of the messages. Comments about message content should be directed to the relevant mailing list.