The UK Home Automation Archive

Archive Home
Group Home
Search Archive


Advanced Search

The UKHA-ARCHIVE IS CEASING OPERATIONS 31 DEC 2024


[Message Prev][Message Next][Thread Prev][Thread Next][Message Index][Thread Index]

Re: Part P questions



Hi Jim

I'm afraid I can't answer your question,  but I was interested to see your
reference to a notification guide.  I have not seen this,  can you supply a
link?

Many thanks,

Simon
----- Original Message -----
From: "Jim" <jim@xxxxxxx>
To: <ukha_d@xxxxxxx>
Sent: Saturday, December 23, 2006 11:44 AM
Subject: [ukha_d] Part P questions


> Some questions for anyone with part P experience.
>
> I've decided to go the Idratek route, as being the easiest wired
system to
> retro-fit and still leave the existing wiring intact (in case I sell
the
> house in the future).
>
> First off, is LAN cabling outside the "remit" of part P?
>
> Am I correct in thinking that replacement of switches with Idratek
> equivalents is replacement and, therefore, doesn't need to be
notified?
>
> How is the Idratek bus cabling viewed under the rules?
>
> (Assume the above are not in a kitchen or special location).
>
>
> As an aside, I've just looked at the latest version of the
notification
> guide (v8 !!). Interesting to note that you can now pretty well do
> anything
> in an out-building, providing the incoming supply was already there.
> Originally it came under the same restrictive rules as the house.
>
>
> Thanks for any info!
>
>
>
>
> Jim
>
>
> [Non-text portions of this message have been removed]
>
>
>
>
>
>




UKHA_D Main Index | UKHA_D Thread Index | UKHA_D Home | Archives Home

Comments to the Webmaster are always welcomed, please use this contact form . Note that as this site is a mailing list archive, the Webmaster has no control over the contents of the messages. Comments about message content should be directed to the relevant mailing list.