The UK Home Automation Archive

Archive Home
Group Home
Search Archive


Advanced Search

The UKHA-ARCHIVE IS CEASING OPERATIONS 31 DEC 2024


[Message Prev][Message Next][Thread Prev][Thread Next][Message Index][Thread Index]

Re: Failover generators



Nigel,

Do you synchronise the two phases before switching back to grid
supply, or do you just let it change over?
Maybe phase synchronisation is not that big an issue with domestic loads?

Thanks,

Tim.

On 6/24/06, Nigel Giddings <nigel@xxxxxxx> wrote:
>
> Once Grid supply is restored a timer starts, if the Grid remains OK
for 5 minutes it switches back to grid and shuts down the Genset.



UKHA_D Main Index | UKHA_D Thread Index | UKHA_D Home | Archives Home

Comments to the Webmaster are always welcomed, please use this contact form . Note that as this site is a mailing list archive, the Webmaster has no control over the contents of the messages. Comments about message content should be directed to the relevant mailing list.