[Message Prev][Message
Next][Thread Prev][Thread Next][Message
Index][Thread Index]
Re: Failover generators
Nigel,
Do you synchronise the two phases before switching back to grid
supply, or do you just let it change over?
Maybe phase synchronisation is not that big an issue with domestic loads?
Thanks,
Tim.
On 6/24/06, Nigel Giddings <nigel@xxxxxxx> wrote:
>
> Once Grid supply is restored a timer starts, if the Grid remains OK
for 5 minutes it switches back to grid and shuts down the Genset.
UKHA_D Main Index |
UKHA_D Thread Index |
UKHA_D Home |
Archives Home
|