RE: Failover generators
- Subject: RE: Failover generators
- From: "Nigel Giddings" <nigel@xxxxxxxxxxxxxx>
- Date: Sat, 24 Jun 2006 18:45:29 +0100
Tim
=20
The changeover is quick=85, there is no syncronisation=85
=20
So quick that a PC without a UPS does not reboot=85
=20
The panel is purpose built so perhaps the contactors used are selected for
=
their speed of changeover
=20
Nigel
=20
_____=20=20
From: Tim Hawes [mailto:timsyahoo@xxxxxxx]=20
Sent: 24 June 2006 12:13
To: ukha_d@xxxxxxx
Subject: Re: [ukha_d] Failover generators
=20
Nigel,
Do you synchronise the two phases before switching back to grid
supply, or do you just let it change over?
Maybe phase synchronisation is not that big an issue with domestic loads?
Thanks,
Tim.
On 6/24/06, Nigel Giddings <HYPERLINK "mailto:nigel%40corbenic.co.uk"nigel@=
corbenic.-co.uk> wrote:
>
> Once Grid supply is restored a timer starts, if the Grid remains OK
for 5=
minutes it switches back to grid and shuts down the Genset.
=20
--
No virus found in this incoming message.
Checked by AVG Free Edition.
Version: 7.1.394 / Virus Database: 268.9.2/373 - Release Date: 22/06/2006
--=20
No virus found in this outgoing message.
Checked by AVG Free Edition.
Version: 7.1.394 / Virus Database: 268.9.2/373 - Release Date: 22/06/2006
=20
[Non-text portions of this message have been removed]
UKHA_D Main Index |
UKHA_D Thread Index |
UKHA_D Home |
Archives Home
|