[Message Prev][Message
Next][Thread Prev][Thread Next][Message
Index][Thread Index]
RE: "UK_Selfbuild" Consumer unit wiring
>I had considered using a UPS to maintain the supply to C-Bus but then
>read that each module, within it's self, needs to be on the same
>phase... I suppose what you have done is some modules totally on UPS
and
>some totally not on the UPS?
I thought it was the opposite and the control side could be on a different
phase to the load, which makes Gareth's implementation possible. I don't
remember seeing any limitations being posed by different phases between
units either.
Btw I'm only going to have single phase so haven't focused on this too
much.
Pete
[Non-text portions of this message have been removed]
UKHA_D Main Index |
UKHA_D Thread Index |
UKHA_D Home |
Archives Home
|